{"id":10439,"date":"2025-01-27T15:21:30","date_gmt":"2025-01-27T14:21:30","guid":{"rendered":"https:\/\/www.emsland-group.de\/spatenstich-fuer-neue-logistikhalle-in-emlichheim\/"},"modified":"2025-01-28T10:15:39","modified_gmt":"2025-01-28T09:15:39","slug":"spatenstich-fuer-neue-logistikhalle-in-emlichheim","status":"publish","type":"post","link":"https:\/\/www.emsland-group.de\/en\/spatenstich-fuer-neue-logistikhalle-in-emlichheim\/","title":{"rendered":"Ground-Breaking Ceremony for New Logistics Hall in Emlichheim"},"content":{"rendered":"\n<p>On January 15, 2025, the official starting signal was given for a pioneering construction project of the Emsland Group: the ground-breaking ceremony for the new logistics hall at the Emlichheim site. Numerous representatives of the Emsland Group as well as participating companies and regional guests attended the event.<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>Size and capacity set new standards<\/strong><\/p>\n\n\n\n<p>The impressive, fully automated logistics hall will be built on an area 200 meters long, 70 meters wide and 27 meters high. With a capacity of 52,000 pallet spaces, the new hall not only ensures safe and quality-assured storage, but also sets new standards in terms of efficiency.<\/p>\n\n\n\n<p>The logistics hall will also be equipped with a 600-metre-long conveyor belt, a 650-metre-long electric floor conveyor and six dispatch lanes. A total of 3,500 tons of steel will be used for the racking systems.<\/p>\n\n\n\n<p><strong>Focus on sustainability<\/strong><\/p>\n\n\n\n<p>The project brings considerable benefits:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Reduction of 2,200 truck trips per year, which corresponds to a saving of around 110,000 kilometers<\/li>\n\n\n\n<li>Significant reduction in CO2 emissions<\/li>\n\n\n\n<li>Minimization of external storage costs<\/li>\n<\/ul>\n\n\n\n<p>These measures underline the Emsland Group&#8217;s commitment to sustainable logistics solutions.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"4000\" height=\"3438\" src=\"https:\/\/www.emsland-group.de\/wp-content\/uploads\/Design-ohne-Titel-14.png\" alt=\"\" class=\"wp-image-10435\" srcset=\"https:\/\/www.emsland-group.de\/wp-content\/uploads\/Design-ohne-Titel-14.png 4000w, https:\/\/www.emsland-group.de\/wp-content\/uploads\/Design-ohne-Titel-14-300x258.png 300w, https:\/\/www.emsland-group.de\/wp-content\/uploads\/Design-ohne-Titel-14-1024x880.png 1024w, https:\/\/www.emsland-group.de\/wp-content\/uploads\/Design-ohne-Titel-14-768x660.png 768w, https:\/\/www.emsland-group.de\/wp-content\/uploads\/Design-ohne-Titel-14-1536x1320.png 1536w, https:\/\/www.emsland-group.de\/wp-content\/uploads\/Design-ohne-Titel-14-2048x1760.png 2048w, https:\/\/www.emsland-group.de\/wp-content\/uploads\/Design-ohne-Titel-14-600x516.png 600w\" sizes=\"(max-width: 4000px) 100vw, 4000px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<p><strong>Infrastructure and construction time<\/strong><\/p>\n\n\n\n<p>In addition to the logistics hall, the infrastructure is also being modernized. A new road will be built through Emlichheim and will provide optimal access to the planned employee parking spaces as well as truck and supplier parking spaces. A bridge will also connect the old warehouse with the new one.<\/p>\n\n\n\n<p>The construction period is tightly scheduled: Construction started at the beginning of January 2025 and the building should be completed by September 2025. The interior work will then begin with work on the racking systems and conveyor technology. Commissioning is scheduled for the third quarter of 2026.<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" src=\"https:\/\/www.emsland-group.de\/wp-content\/uploads\/IMG_8425-768x1024.jpg\" alt=\"\" class=\"wp-image-10418\" style=\"aspect-ratio:4\/3;object-fit:cover\" srcset=\"https:\/\/www.emsland-group.de\/wp-content\/uploads\/IMG_8425-768x1024.jpg 768w, https:\/\/www.emsland-group.de\/wp-content\/uploads\/IMG_8425-225x300.jpg 225w, https:\/\/www.emsland-group.de\/wp-content\/uploads\/IMG_8425-1152x1536.jpg 1152w, https:\/\/www.emsland-group.de\/wp-content\/uploads\/IMG_8425-1536x2048.jpg 1536w, https:\/\/www.emsland-group.de\/wp-content\/uploads\/IMG_8425-600x800.jpg 600w, https:\/\/www.emsland-group.de\/wp-content\/uploads\/IMG_8425-scaled.jpg 1920w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>Ground-breaking ceremony<\/strong><\/p>\n\n\n\n<p>Numerous representatives of the Emsland Group and the region attended the ground-breaking ceremony. Among the guests were Herbert Zwartscholten (Head of Logistics), Arne G\u00f6vert (Head of Industrial Engineering and Overall Project Management), Gerhard Deuling (Chairman of the Supervisory Board of Emsland-St\u00e4rke AG), Hermann Vortherms (Chairman of the Supervisory Board of Emsland-St\u00e4rke GmbH), Lambert Vette (1st Chairman EZG), Dirk Oevermann (Commercial Director EZG), the management of the Emsland Group: Gerrit-Jan Wesselink (CEO), Christian Kemper (CSO) and Stefan Hannemann (COO) as well as Mayor Arne Helweg and joint municipal councillor Mirko Breukelman were present.<\/p>\n\n\n\n<p>After a brief introduction by project managers Arne G\u00f6vert and Herbert Zwartscholten, the official ground-breaking ceremony took place. Afterwards, a get-together provided an opportunity for a lively exchange between all those involved.<\/p>\n<\/div>\n<\/div>\n\n\n\n<p><strong>Investment in the future<\/strong><\/p>\n\n\n\n<p>With an investment of 38 million euros, the Emsland Group is not only securing the location and improving working conditions, but is also sending out a clear signal for sustainable and efficient logistics. The involvement of regional companies in the construction work also underlines the importance of this project for the entire region.<\/p>\n\n\n\n<p>We look forward to the completion of this forward-looking project and the positive effects it will bring for logistics and the region.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On January 15, 2025, the official starting signal was given for a pioneering construction project of the Emsland Group: the ground-breaking ceremony for the new logistics hall at the Emlichheim site. Numerous representatives of the Emsland Group as well as participating companies and regional guests attended the event. Size and capacity set new standards The [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":10455,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[321],"tags":[],"class_list":["post-10439","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en","news-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Ground-Breaking Ceremony for New Logistics Hall in Emlichheim - Emsland Group<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.emsland-group.de\/en\/spatenstich-fuer-neue-logistikhalle-in-emlichheim\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ground-Breaking Ceremony for New Logistics Hall in Emlichheim - Emsland Group\" \/>\n<meta property=\"og:description\" content=\"On January 15, 2025, the official starting signal was given for a pioneering construction project of the Emsland Group: the ground-breaking ceremony for the new logistics hall at the Emlichheim site. Numerous representatives of the Emsland Group as well as participating companies and regional guests attended the event. Size and capacity set new standards The [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.emsland-group.de\/en\/spatenstich-fuer-neue-logistikhalle-in-emlichheim\/\" \/>\n<meta property=\"og:site_name\" content=\"Emsland Group\" \/>\n<meta property=\"article:published_time\" content=\"2025-01-27T14:21:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-01-28T09:15:39+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.emsland-group.de\/wp-content\/uploads\/hochregallager-emslandstaerke-final-2-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"emsland-group\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"emsland-group\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Ground-Breaking Ceremony for New Logistics Hall in Emlichheim - Emsland Group","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.emsland-group.de\/en\/spatenstich-fuer-neue-logistikhalle-in-emlichheim\/","og_locale":"en_US","og_type":"article","og_title":"Ground-Breaking Ceremony for New Logistics Hall in Emlichheim - Emsland Group","og_description":"On January 15, 2025, the official starting signal was given for a pioneering construction project of the Emsland Group: the ground-breaking ceremony for the new logistics hall at the Emlichheim site. Numerous representatives of the Emsland Group as well as participating companies and regional guests attended the event. Size and capacity set new standards The [&hellip;]","og_url":"https:\/\/www.emsland-group.de\/en\/spatenstich-fuer-neue-logistikhalle-in-emlichheim\/","og_site_name":"Emsland Group","article_published_time":"2025-01-27T14:21:30+00:00","article_modified_time":"2025-01-28T09:15:39+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/www.emsland-group.de\/wp-content\/uploads\/hochregallager-emslandstaerke-final-2-1024x683.png","type":"image\/png"}],"author":"emsland-group","twitter_card":"summary_large_image","twitter_misc":{"Written by":"emsland-group","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.emsland-group.de\/en\/spatenstich-fuer-neue-logistikhalle-in-emlichheim\/#article","isPartOf":{"@id":"https:\/\/www.emsland-group.de\/en\/spatenstich-fuer-neue-logistikhalle-in-emlichheim\/"},"author":{"name":"emsland-group","@id":"https:\/\/www.emsland-group.de\/en\/#\/schema\/person\/471d4e39411a11b540cce53526a26763"},"headline":"Ground-Breaking Ceremony for New Logistics Hall in Emlichheim","datePublished":"2025-01-27T14:21:30+00:00","dateModified":"2025-01-28T09:15:39+00:00","mainEntityOfPage":{"@id":"https:\/\/www.emsland-group.de\/en\/spatenstich-fuer-neue-logistikhalle-in-emlichheim\/"},"wordCount":489,"publisher":{"@id":"https:\/\/www.emsland-group.de\/en\/#organization"},"image":{"@id":"https:\/\/www.emsland-group.de\/en\/spatenstich-fuer-neue-logistikhalle-in-emlichheim\/#primaryimage"},"thumbnailUrl":"https:\/\/www.emsland-group.de\/wp-content\/uploads\/hochregallager-emslandstaerke-final-2.png","articleSection":["Article"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.emsland-group.de\/en\/spatenstich-fuer-neue-logistikhalle-in-emlichheim\/","url":"https:\/\/www.emsland-group.de\/en\/spatenstich-fuer-neue-logistikhalle-in-emlichheim\/","name":"Ground-Breaking Ceremony for New Logistics Hall in Emlichheim - Emsland Group","isPartOf":{"@id":"https:\/\/www.emsland-group.de\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.emsland-group.de\/en\/spatenstich-fuer-neue-logistikhalle-in-emlichheim\/#primaryimage"},"image":{"@id":"https:\/\/www.emsland-group.de\/en\/spatenstich-fuer-neue-logistikhalle-in-emlichheim\/#primaryimage"},"thumbnailUrl":"https:\/\/www.emsland-group.de\/wp-content\/uploads\/hochregallager-emslandstaerke-final-2.png","datePublished":"2025-01-27T14:21:30+00:00","dateModified":"2025-01-28T09:15:39+00:00","breadcrumb":{"@id":"https:\/\/www.emsland-group.de\/en\/spatenstich-fuer-neue-logistikhalle-in-emlichheim\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.emsland-group.de\/en\/spatenstich-fuer-neue-logistikhalle-in-emlichheim\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.emsland-group.de\/en\/spatenstich-fuer-neue-logistikhalle-in-emlichheim\/#primaryimage","url":"https:\/\/www.emsland-group.de\/wp-content\/uploads\/hochregallager-emslandstaerke-final-2.png","contentUrl":"https:\/\/www.emsland-group.de\/wp-content\/uploads\/hochregallager-emslandstaerke-final-2.png","width":4415,"height":2946},{"@type":"BreadcrumbList","@id":"https:\/\/www.emsland-group.de\/en\/spatenstich-fuer-neue-logistikhalle-in-emlichheim\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.emsland-group.de\/en\/"},{"@type":"ListItem","position":2,"name":"Ground-Breaking Ceremony for New Logistics Hall in Emlichheim"}]},{"@type":"WebSite","@id":"https:\/\/www.emsland-group.de\/en\/#website","url":"https:\/\/www.emsland-group.de\/en\/","name":"Emsland Group","description":"","publisher":{"@id":"https:\/\/www.emsland-group.de\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.emsland-group.de\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.emsland-group.de\/en\/#organization","name":"Emsland Group","url":"https:\/\/www.emsland-group.de\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.emsland-group.de\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.emsland-group.de\/wp-content\/uploads\/2022\/08\/emsland-group_logo.svg","contentUrl":"https:\/\/www.emsland-group.de\/wp-content\/uploads\/2022\/08\/emsland-group_logo.svg","width":1,"height":1,"caption":"Emsland Group"},"image":{"@id":"https:\/\/www.emsland-group.de\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.emsland-group.de\/en\/#\/schema\/person\/471d4e39411a11b540cce53526a26763","name":"emsland-group"}]}},"_links":{"self":[{"href":"https:\/\/www.emsland-group.de\/en\/wp-json\/wp\/v2\/posts\/10439","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emsland-group.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emsland-group.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emsland-group.de\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emsland-group.de\/en\/wp-json\/wp\/v2\/comments?post=10439"}],"version-history":[{"count":2,"href":"https:\/\/www.emsland-group.de\/en\/wp-json\/wp\/v2\/posts\/10439\/revisions"}],"predecessor-version":[{"id":10443,"href":"https:\/\/www.emsland-group.de\/en\/wp-json\/wp\/v2\/posts\/10439\/revisions\/10443"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emsland-group.de\/en\/wp-json\/wp\/v2\/media\/10455"}],"wp:attachment":[{"href":"https:\/\/www.emsland-group.de\/en\/wp-json\/wp\/v2\/media?parent=10439"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emsland-group.de\/en\/wp-json\/wp\/v2\/categories?post=10439"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emsland-group.de\/en\/wp-json\/wp\/v2\/tags?post=10439"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}